Perth Children’s Hospital

The Perth Children’s Hospital project will deliver a replacement for the ageing Princess Margaret Hospital (PMH) facility.  PMH has been operating as a Children’s hospital at the current site since 1909.  PMH is the only tertiary and quaternary paediatric hospital in Western Australia and provides both tertiary and secondary children’s health services across the State, and is the designated paediatric trauma centre.

The Perth Children’s Hospital is currently under construction on the Queen Elizabeth II Medical Centre (QEIIMC) campus adjacent to G Block on the Sir Charles Gairdner Hospital (SCGH) on land formerly used for car parking.

Forward planning includes the future relocation of the King Edward Memorial Hospital (KEMH) to the QEIIMC, which will result in the collocation of tertiary maternity, neonatal, paediatric and adult services on one site.

The Perth Children’s Hospital will be a unique development, housing organisations which are nationally and internationally recognised for paediatric clinical care, clinical research and tertiary education. The new facility will accommodate hospital facilities as well as integrated Research and Education facilities accommodating Telethon Institute of Child Health Research (TICHR) and UWA research facilities.

Design work commenced in July, 2011 and construction of early works packages are underway in order to permit a fast-tracked construction program to be completed by mid 2016.

Through a highly collaborative and interactive development, consideration of national and international trends as well as a thorough understanding of the site and relationships with its neighbours, design solutions have been agreed which marry the complex clinical, research and educational requirements, resolve the critical adjacencies, respond to the clearly articulated design aspirations, enhancing the overall dynamic qualities of the various parts to form the Perth Children’s Hospital.

The design creates a highly functional, efficient and flexible healing environment in an integrated health care setting offering the following qualities;

  • Reinforcement of a commitment to an overall child & adolescent focussed care and family centred practice
  • Enhancement of the connectivity opportunities with the existing site and neighbourhood
  • Achievement of clear and distinct external and internal navigation and way finding flows
  • Provision of clear public drop off and entry locations
  • Consolidation of the public spaces in close proximity to high-volume outpatient areas and public car parks
  • Consolidation of the offices and clinics functions and integrating the perioperative and critical care areas
  • Positioning of the lower height inpatient units to the south of the site as a way to minimize impact on the adjacent the residential and take advantage of the comforting views to the south
  • Maximising views and relationship to Kings Park

The Hospital will provide 296 beds comprising surgical and medical general multiday beds, Oncology, Burns, NICU, PICU, High Dependency Unit (HDU) specialty beds, Emergency Short Stay, Mental Health Unit, Eating disorders, Operating Theatre Recovery, Clinical Investigation Unit, Sleep Unit and Maternity beds as well as clinics and supporting services. Integrated research laboratories are included within the facility accommodating private and publically funded research and Medical education organisations.

The Architectural Design team for the New Children’s Hospital is a joint venture comprising:

  • JCY Architects and Urban Designers
  • Cox Howlett and Bailey Woodland
  • Billard Leece Partnership with HKS
Show more information

Type
Health

Project Number
1123

Client
John Holland as Managing Contractor, engaged by the WA Government

Status
Under construction. Completion due early -2017

Location
QEII Medical Centre, Nedlands, Western Australia, 6009

Value
$1.26 billion

Key Personnel
JCY - Andrew Rogerson, Richard Young, Paul Jones, Paul Steed, Glenn Russell, Ian Hart, Alister Swingler, Brad Shales, Charles Thwin, Charmaine Anderson, Clare Porter, Colleen Smith, Damien Hatton, Derek Swift, Eka Pujianto, Elaine Tiplady, Erich Renner, Fathmath Evan, Fay O’Rourke, Finnbar Ingram, Griselda Fernandez, Jackie Anderson, Jason Welten, Jenny Tseng, Joshua Lane, Josie Porter, Kaine Jenkins, Krysti Henderson, Lee-Anne Kho, Libby Guj, Lucia Siciliano, Luke Gay, Merv Williams, Nathan McGuire, Paul Reilly, Paul Steed, Paula Carrigg, Peter Van Geloven, Philip Kirke, Rob Ramsay, Rujita Dalwadi, Salina Le Bron, Sharon Krisanovski, Sharron Faraj, Simon Venturi, Stephen Fisher, Suey Ann, Thian Chua, Thomas McKendrick, Valeria Zanotto, Wayne Greensil

Services Provided
Concept Design, Schematic Design, Detailed Design, Construction Phase review, Interior design

Referee
John Hamilton, Principal Project Director, Strategic Projects; Vince Mulholland, Project Director, John Holland

Architects in Association
Cox Howlett & Bailey Woodland, Billard Leece Partnership with HKS

Gross Floor Area
125,000 m²

Number of Levels
2 basement levels, 8 levels above ground, roof top plant level

Facilities Provided
296 beds comprising surgical and medical general multiday beds, Oncology, Burns, NICU, PICU, High Dependency Unit (HDU) specialty beds, Emergency Short Stay, Mental Health Unit, Eating disorders, Operating Theatre Recovery, Clinical Investigation Unit, Sleep Unit and Maternity beds as well as clinics and supporting services. Integrated research laboratories are included within the facility accommodating private and publically funded research and Medical education organisations.

Construction / Materials
Concrete structural frame, curtain walling, vitreous enamel cladding and lightweight internal stud walls.

Cost
$1.26 billion

Construction Period
Under construction

Google Map Link
View on Google Maps

PDF Download
Download

Map Address
QEII Medical Centre, Nedlands, Western Australia, 6009

Show more information